Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Zibo Yida Equipment Installation Engineering Co., Ltd.

Shandong chemical equipment installation, Shandong pressure pipeline installa...

sell
  • There is no classification
contact
  • Contact:朱经理
  • Phone:0533-6060286
search
 
link
  • There is no link yet
home > sell > Introduction to Shandong pressure vessel installation
Introduction to Shandong pressure vessel installation
products: Views:7Introduction to Shandong pressure vessel installation 
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-02-29 11:11
 
Details
Pressure vessels such as liquid receivers, oil-ammonia separators, intercoolers, ammonia-liquid separators, circulating liquid storage barrels and oil collectors should be checked to see if they have manufacturer test certificates before cold storage installation, then Shandong Pressure Vessel Installation< br/>What is included? Next, I will introduce it to you in detail: Before installing the pressure vessel equipment, you should check whether there is moisture, iron filings, dirt and debris inside the vessel. If so, it should be measured in kilograms/cm. Compressed air is used for single blowdown purging. Such substances are not allowed inside the container. The installation of equipment should have a suitable concrete foundation, and the container should be fixed on the foundation with bolts. Horizontal containers such as liquid receivers should be kept horizontal. Vertical containers such as intercoolers should be absolutely vertical during installation and should not be tilted at any angle. When installing low-temperature containers, heat insulation pads should be added between the foundation and the bracket. When installing container equipment, check the pipe joints and do not install them backwards, front or rear, left or right to avoid connecting the wrong pipes.
The above is an introduction to the installation of pressure vessels in Shandong. At the same time, before installation and construction, engineering technicians and construction personnel should carefully review product drawings, instructions, and other technical materials to clarify the quality requirements and technical requirements.
Request for quotation
A total of0articles  Related Comments: